Asterholma, 芬兰

  • 建筑类型:
  • 能源设施
全屏地图 关闭

In the summer of 2023, Peikko supplied key foundation components to the Asterholma project in Åland, including one Rock Adapter foundation fully manufactured in Finland.

SUVIC managed the civil works, with Peikko providing 40 pieces of FATBAR® 56 Post-Tensioned Anchors, each 12 meters long, along with one Rock Adapter plate set with short tower bolts for an Enercon E70 turbine.

The Rock Adapter solution features the most compact foundation, reducing concrete use by eliminating the traditional anchor cage.

The FATBAR® Post-Tensioned Anchor offers proven quality as an ETA-assessed and CE-marked product, ensuring a safe and reliable solution. Its compact design is optimized for material efficiency, environmental consciousness, and cost-effective installation. Additionally, the FATBAR anchor simplifies risk management with easy re-tensioning, supporting hassle-free maintenance throughout the foundation's lifecycle.

For more information on FATBAR®, please visit: Peikko.com/fatbar

 

阅读更多 down-arrow.png

项目概览

开发商:
Asterholma Vindenergi AB
施工单位:
Suvic Oy
交付年份:
2023
完成时间:
2023
风电机数量:
1
风电机制造商:
Enercon
风电机尺寸, MW:
E-70 E4/S/69/4F/01 2.8MW
轮毂高度, m:
69

我们提供的解决方案

联系我们