Federal Chancellery of Germany, Berlin, 德国

  • 建筑类型:
  • 其他公共建筑
全屏地图 关闭 街景视图

Bolted connections for precast concrete parts in the largest government headquarters in the world

In order to build the Federal Chancellery in Berlin, Peikko's bolted connections were used for the precast concrete elements, some of which were made in white pigmented exposed concrete.Anchor bolts and column shoes for precast columns as well as wall shoes in connection with anchor bolts enabled efficient assembly of the reinforced concrete supporting structure.  

Together with the Marie-Elisabeth-Lüders House and Paul-Löbe Building, the Federal Chancellery is part of the "Federal Belt" (German: "Band des Bundes"), an architectural symbol of the German unity. The building complex was built when the goverment of Germany moved from Bonn to Berlin about ten years after the German reunification 1989.

阅读更多 down-arrow.png

The construction with its unusual variety of shapes in exposed concrete required very high standards in structural design and building physics.

GSE Ingenieurgesellschaft mbH

项目概览

项目规模:
25347 m2
楼层:
8
开发商:
Im Auftrag der Bundesrepublik Deutschland für die Bundesregierung Bundesbaugesellschaft Berlin
施工单位:
Arge Rohbau Bundeskanzleramt, Hmb Hallesche Mitteldeutsche Bau AG, Wayss & Freytag AG, Hoch- und Wirtschaftsbau, Cubiertas Y Mzov GmbH
结构设计师:
GSE Ingenieurgesellschaft mbH
建筑师:
SCHULTES FRANK ARCHITEKTEN
完成时间:
2001

联系我们

Tobias Althaus

Tobias Althaus

Managing Director

Peikko Deutschland GmbH

手机+49 170 163 8168
[email protected]