General Industrial Factory, Jurong West, 新加坡

  • 建筑类型:
  • 工业建筑
全屏地图 关闭

HPKM® Column Shoe connections and COLIFT Mounting System were used in 9-storey single user general industrial factory in Jurong West area. Peikko's solutions provided an easy and safe solution without bracing the precast columns in temporary construction stage.

项目概览

楼层:
9
开发商:
Tiong Seng Contractors (Pte) Ltd.
施工单位:
Tiong Seng Contractors (Pte) Ltd.
结构设计师:
LSW Consulting Engineers Pte Ltd
构件生产商:
Robin Village Development Pte Ltd
交付年份:
2016
完成时间:
2017

我们提供的解决方案

联系我们

Topi Laiho

Topi Laiho

Country Manager, Singapore

手机040 776 2503
[email protected]