Inoduestag Factory And R&D Building, Avencehes, 瑞士

  • 建筑类型:
  • 仓储建筑

A new production and R&D building for a company Inoduestag was built to Avencehes, Switzerland by using precast frame. This building method is not yet very common in Switzerland, which is a traditional in-situ market in many ways. The objective to use precast frame structure in this project was to cut the construction time - and this objective was achieved.

Structural concept

The structure of the building was built by using high quality pre-fabricated structural and facade elements. The column foundations were cast in-situ at the building site and due to poor soil characteristics stabilized by piling. The foundations were topped with 1.50 meters high columns, followed by beams, slabs and columns.

Fast construction process

The assembly of the precast columns was greatly speeded up by the use of Peikko's anchor bolts and column shoes. Thanks to the close coordination between the construction company Wirz AG, the precaster Element AG and the engineering company Brandt's Ingenieure AG the project was implemented successfully without any technical problems.

Although most participants of the project were using this building method first time the work proceeded very effectively. E.g. the total amount of 80 columns was assembled with the average speed of 15 columns a day. And of course, the columns needed no additional supports at the time and after the assembly due to the use of Peikko's column shoes.

Peikko Designer® was used to help the project

In order to design the most optimal solution for columns, Peikko Switzerland's engineers prepared three proposals for the used column shoes and their cost estimates. The free-downloadable software can calculate a variety of loadings during assembly and when the building is complete. Peikko Designer is available for download on this website. Loadings were calculated according to SIA 261: Loadings such as wind (during assembly) or vehicle accidents in combination with other loads can be rapidly run through the program.

阅读更多 down-arrow.png

项目概览

施工单位:
Wirz AG Bauunternehmung, Bern, Switzerland
结构设计师:
Brandt's Ingenieure AG, Murten, Switzerland
建筑师:
bd architects AG., Murten, Switzerland
交付年份:
2010
完成时间:
2010