PwC, Park Side, 瑞士

  • 建筑类型:
  • 办公楼宇
全屏地图 关闭

The "Park Side" project in Zurich, Switzerland, can be best described as modern and innovative. It encompasses a residential park and an office building, showcasing a seamless blend of aesthetics and functionality.

The high-quality standards of the project were met by utilizing the remarkable BESISTA® tension rod systems in the construction of the PricewaterhouseCoopers (PwC) office building.

The slender tension bars and rod anchors provided by BESISTA® play a vital role in stabilizing the facade construction, harmoniously integrating with the delicate glass assembly. To ensure utmost reliability and cost-effectiveness, BESISTA® directly supplied the tension rod systems to the facade contractor.

Furthermore, the construction project highlights the exceptional pre-tensioning capability of the BESISTA® tension rod system. Each tension rod system underwent a pre-tensioning process of 180 kN, utilizing the advanced BVS-230 pre-tensioning system developed by BESISTA®.

阅读更多 down-arrow.png

项目概览

开发商:
Kilintra, UBS Fund Management, CH-Basel
结构设计师:
Walt+Galmarini, Zürich
建筑师:
Kaufmann, van der Meer+Partner, Zürich

我们提供的解决方案

联系我们

Štefan Gavura

Štefan Gavura

Product Manager

Punching Prevention Systems, Rebar Coupling Systems

手机+421 911 250 080
[email protected]