The Grange University Hospital, Cwmbran, Wales, 英国

  • 建筑类型:
  • 医院建筑
全屏地图 关闭 街景视图

The 560 bed £350m Grange University Hospital opened ahead of schedule in November 2020 with zero defects in time to help the NHS Trust to respond to the winter season pressures and the second wave of Covid-19.

This was made possible using a DfMA approach to which Peikko DELTABEAM® and Column Shoes played an integral part. Working the contractor Laing O’Rourke and the structural engineers WSP Peikko designed & supplied over 550nr DELTABEAM®’s to the project. So, helping achieve the target of over 70% of the components to be manufactured offsite. The use of DELTABEAM® along with Peikko column shoes & anchor bolts allowed for minimal propping making construction both fast & safer. Therefore, playing a major role in the 23% program saving, including over 237,000 working hours.

阅读更多 down-arrow.png

The hospital opened ahead of schedule on 17th November 2020 to help us respond to winter season pressures and the second wave of COVID-19

NHS Wales

项目概览

楼层:
Three suspended floors and roof
开发商:
Aneurin Bevan University Health Board
施工单位:
Laing O’Rourke
结构设计师:
WSP Cardiff
建筑师:
BDP
构件生产商:
Explore Manufacturing
交付年份:
2018
完成时间:
2020