The Hot Spring Colonnade, Karlovy Vary, 捷克共和国

  • 建筑类型:
  • 医院建筑
全屏地图 关闭

The Hot Spring Colonnade building in Karlovy Vary, where the famous healing spring flows, was in such a bad condition that it was necessary to carry out a fundamental reconstruction.

Water leaking into the structure and extreme environment, created by mineral water and aggressive fumes from the underground, caused extensive corrosion of the load bearing reinforced concrete structure.

The existing monolithic concrete structure was replaced by a composite reinforced concrete structure with special DELTABEAM® Composite Beams treated with hot-dip galvanizing. These beams represent one of the technological peculiarities of reconstruction of The Hot Spring Colonnade in Karlovy Vary.

The solution, which is commonly used in the construction of buildings, will carry the floor under the most famous symbol of the royal spa town – the so-called hot spring bowl.  Among the main advantages of DELTABEAM® Composite Beams belong their easy assembly and ability to withstand extreme underground conditions, namely the aggresive and high carbon environment.

阅读更多 down-arrow.png

项目概览

项目规模:
350 m2
楼层:
1
开发商:
Statutární město Karlovy Vary
施工单位:
BAU-STAV a.s.
结构设计师:
KSI s.r.o., Ing. Petr Hampl
交付年份:
2019
完成时间:
2022

我们提供的解决方案

联系我们

Jaroslav Opavský

Jaroslav Opavský

obchodní manažér oblast Čechy

手机+420 724530816
[email protected]