Water treatment plant, Eindhoven, 荷兰

  • 建筑类型:
  • 工业建筑
  • 基础建设
全屏地图 关闭 街景视图

For the raising of the sedimentation basin within the sewage treatment plant in Eindhoven, the precast elements are connected to each other in a fast and efficient way with the Peikko SUMO® wall shoe connection. 

This dry connection consists of a SUMO® Wall shoe cast in one element and an HPM® anchor bolt cast in the other element. Together this forms the wall shoe joint that absorbs tensile loads. To provide protection against corrosion, the connections are galvanized in this project.

项目概览

开发商:
Waterschap De Dommel
施工单位:
Van Boekel Bouw & Infra
构件生产商:
Haitsma Beton
交付年份:
2019
完成时间:
2020

我们提供的解决方案

联系我们