Waterfall Station Upgrade - Footbridge, Waterfall, 澳大利亚

  • 建筑类型:
  • 基础建设
全屏地图 关闭

As part of work on the Waterfall Stabling Yard and Platform Extension Project, Transport for NSW are building a staff footbridge, requiring the quick installation of a precast solution for supporting columns.

Peikko’s column shoes and anchor bolts were installed within the tight column dimensions and can withstand high loading.

项目概览

开发商:
Transport for Tommorow
施工单位:
Kilmac Civil
结构设计师:
KBR, Australia
交付年份:
2022
完成时间:
2022

我们提供的解决方案

联系我们