Peikko Group Global (English)
The initial plan was to use concrete beams for this project. However, they were replaced by DELTABEAM® Composite Beams as the use of DELTABEAM® enabled easier and faster construction in the project.
Wim Zwaan
Directeur
电话 +31 (0)26 384 38 66 手机+31 (0)6 23 80 70 05 [email protected]